UK-Harwich: Construction work for highways, roads.

UK-Harwich: Construction work for highways, roads.


Scope


Description: This requirement is to reinstate existing road surface to eliminate potholes and provide the same level of road surface as previously laid to the lower part of the track in 2017. This consisted of 60mm of AC20 dense binder, cut ties to adjoining surfaces, sweep to remove lose material, supply and apply a tack coat of bitumen emulsion, supply lay and consolidate a nominal 30mm thickness of 6mm SMA57PSV. The area required for this new work is the access gate at the carpark to the bore hole shed, halfway between the carpark and the Lighthouse
To view this notice, please click here:
https://trinityhouse.delta-esourcing.com/delta/viewNotice.html?noticeId=1006452718

Total value (estimated):








Contract Details



Contract 1



Contract value: GBP 9,121,486.52 including VAT



Below the relevant threshold: Yes



Award decision date: 06/01/2026



Earliest date the contract will be signed: 14/01/2026



Contract dates (estimated): 02/02/2026 to 22/02/2026



Main procurement category: WORKS



CPV classifications:
45233100 - Construction work for highways, roads.







Supplier




Supplier: Ryebridge Construction Limited



Voyager House, 142 Prospect Way

Luton

LU2 9QH

UK


Email: kcarter@ryebridgeconstruction.com



Small or medium-sized enterprise (SME): Yes





Contract: 1




Procedure


Procedure type: Below threshold - limited competition

Contracting Authorities