UK-Harwich: Construction work for highways, roads.
UK-Harwich: Construction work for highways, roads.
Scope
Description: This requirement is to reinstate existing road surface to eliminate potholes and provide the same level of road surface as previously laid to the lower part of the track in 2017. This consisted of 60mm of AC20 dense binder, cut ties to adjoining surfaces, sweep to remove lose material, supply and apply a tack coat of bitumen emulsion, supply lay and consolidate a nominal 30mm thickness of 6mm SMA57PSV. The area required for this new work is the access gate at the carpark to the bore hole shed, halfway between the carpark and the Lighthouse
To view this notice, please click here:
https://trinityhouse.delta-esourcing.com/delta/viewNotice.html?noticeId=1006452718
Total value (estimated):
Contract Details
Contract 1
Contract value: GBP 9,121,486.52 including VAT
Below the relevant threshold: Yes
Award decision date: 06/01/2026
Earliest date the contract will be signed: 14/01/2026
Contract dates (estimated): 02/02/2026 to 22/02/2026
Main procurement category: WORKS
CPV classifications:
45233100 - Construction work for highways, roads.
Supplier
Supplier: Ryebridge Construction Limited
Voyager House, 142 Prospect Way
Luton
LU2 9QH
UK
Email: kcarter@ryebridgeconstruction.com
Small or medium-sized enterprise (SME): Yes
Contract: 1
Procedure
Procedure type: Below threshold - limited competition